FieldSquire is a fence estimating app for iPhone and Android that turns a spoken or typed job description into an itemized estimate. Fence contractors use it as a fence estimator app to price footage, posts, panels, gates, and removal with their own rates, edit every line, and send a branded PDF quote from the job site. The Solo plan is $19.99 a month with a 7-day free trial.
FieldSquire is designed for quick field estimates—not enterprise software that takes weeks to configure. Use your own business profile, pricing, margins, terms, and document colors. AI prepares a draft; you stay in control of the bid.
Why fence estimates lose margin
- Footage, corners, gates, grade, soil, access, demolition, and utility requirements affect labor.
- Wood, vinyl, chain link, ornamental, and farm fencing need different assemblies.
- Survey, property-line, permit, HOA, and utility-locate responsibilities must be clear.
Build a clearer scope, line by line
Layout
Linear footage, corners, ends, grade changes, and site access.
Posts and foundations
Post type, spacing, depth, concrete, drilling, and difficult soil.
Fence systems
Wood, vinyl, chain link, ornamental, wire, panels, rails, and pickets.
Gates
Walk gates, drive gates, posts, hinges, latches, operators, and hardware.
Removal
Existing fence, vegetation, haul-off, disposal, and surface restoration.
Closeout
Alignment, cleanup, touch-up, customer walk-through, and exclusions.
Example fence estimate lines
These examples show how scope can be separated for review. They are not prices or a substitute for verified measurements and supplier costs.
How FieldSquire works on a fence job
- Start with the project type and scope. Add customer contact details, the job address, and a reminder later when needed.
- Record field notes or type the scope. Attach useful job photos for your own reference.
- Request an AI-assisted draft using the job context, company price list, and learned prices.
- Edit or delete each line, verify quantities and direct costs, and confirm exclusions and allowances.
- Let FieldSquire apply private overage and profit settings to calculate the selling price.
- Add terms, a deposit, and optional customer approval, then send the PDF by SMS or email.
SAVE THE PART OF THE DAY YOU CANNOT REPLACE
Fast quotes can give a busy contractor a workweek back.
FieldSquire is built to turn a walkthrough into an editable quote in a minute or two. If a contractor saves about 30 minutes across 20 quotes each week, that is roughly 40 hours returned over a month. Actual savings depend on quote volume and the old workflow—but less truck-seat paperwork means more time for paying work, customers, and home.
Built for solo contractors and five-person crews
Solo includes unlimited manual estimates, 20 successful AI estimates, and private learned prices. Crew includes 75 shared AI estimates and gives up to five members a shared business profile, leads, estimates, job photos, and learned prices. The owner keeps the company identity consistent while a contractor, salesperson, or foreman can be named on the quote.
Fence estimating app for wood, vinyl, chain-link, and gates
Use FieldSquire as mobile fence estimating software for privacy fence bids, chain-link quotes, vinyl fence estimates, repair proposals, gates, demolition, post concrete, hardware, and installation labor. Build a customer-ready fence estimate PDF while keeping company margin calculations private.
Questions about FieldSquire for fence work
Can FieldSquire calculate post count?
AI can draft from footage and spacing you provide, but verify corners, ends, gates, terrain, and local post requirements.
Can I price different fence materials?
Yes. Build separate options or duplicate an estimate and replace the material assembly and unit prices.
Can I include utility-locate or survey exclusions?
Yes. Add them to scope notes and contract terms so responsibilities are clear.
Does the Crew plan share leads?
Yes. Sales and field members can share opportunity records, estimate reminders, photos, and saved quotes.
How many posts are needed for a straight 100 ft fence at 8 ft maximum spacing?
A single open straight run needs 13 bays and 14 posts: round 100 ÷ 8 up to 13 bays, then add one end post. Corners, gates, shared posts, and separate runs change the layout.
How many rails are needed with three rails per fence bay?
Multiply the verified bay count by three. For 13 bays, that is 39 rail pieces before any waste, if one selected rail spans each bay. Check stock length, joints, gates, and the specified layout.
How do I estimate picket quantity?
Use the actual board width and intended gap or overlap to determine coverage along each run. Then account for gates, cutting, and a stated waste allowance. Nominal board dimensions alone can misstate coverage.
How should fence screws or nails be estimated?
Count the required connections and fasteners per connection from the selected assembly, then divide by the product’s pack coverage. Include the required type and corrosion rating; do not assume a token hardware cost.
Is one bag of concrete per fence post always enough?
No. Hole diameter, depth, post displacement, and the product’s stated yield determine the concrete volume and bag count. Confirm the installation requirements and actual hole sizes before ordering.
What costs should gates and fence removal include?
Review gate posts, frame, hinges, latch, bracing, installation labor, demolition, hauling, and disposal as applicable. Treat slope, access, obstructions, and separate runs as job-specific scope.
Test it on your next fence walkthrough.
The Solo plan includes 7 days free and 5 successful AI estimates, after a free first quote with no account or card. It ends automatically with no charge.
Start the free Solo trial