How Much to Charge for Excavation — Your Machine Rate, Built Honestly

The hourly rate on your card is carrying more than your time — it's carrying the iron. Excavation contractors who price from the going rate instead of their machine math are usually converting equipment equity into customer discounts. Here's the build.

The machine-rate calculation (mini-ex example)

Pricing a job from the rate

Job = mobilization + (machine hours × rate) + trucking cycle + materials + restoration. Example: French-drain dig, 80 lf — float 45 min each way ($254), 5 machine hours ($845), stone 12 tons delivered ($540), pipe and fabric ($260), restoration hour ($169) ≈ $2,070 quoted. Every line defensible, every line reusable on the next drain.

The two leaks to plug

Free mobilization — the float is real hours on real diesel; line it. Optimistic utilization — dividing ownership across hours you don't actually bill makes every job quietly subsidize the machine. Count last year's meter hours and believe them.

Let the rates repeat

Correct FieldSquire's drafts to your built rates once and every future quote carries them — narrated at the site, signed at the tailgate. Verify the margin arithmetic on the free margin calculator, then run one real bid through the excavation estimating app — free for 14 days.


Try it on a real job: FieldSquire's Solo plan is free for 14 days with no credit card — unlimited manual estimates and AI-assisted drafts you review line by line. Start the free trial or see the excavation estimating app guide.